PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Derrick -5 (4th Floor and Roof) Facing South  (800x600).jpg Derrick -5 and the main steel column Facing North-West (800x600).jpg Erecting Derrick -5 (Roof) Facing South-East (800x600).jpg Erecting the main steel column at the Monumental Stairs Facing North-West (600x800).jpg Erecting the steel column Facing East (600x800).jpg Installing the main Steel Column at the Monumental Stairs Facing South (800x600).jpg
Previous pageNext page Erecting the steel column Facing East (600x800)
Erecting the steel column Facing East (600x800)